Our Projects

  • 5km x 40” AKK Gas transmission pipeline for Oilserv/NNPC (1st Phase completed in 2022, 2nd Phase contract negotiations ongoing)
  • Gas Spurline fabrication for Axxela (Gaslink Oando) to several companies (Call out contracts since 2018)
  • Internal Pipeline fabrications for Gas Power supplies for Axxela (Gaslink Oando) clients (Call out Contracts since 2018)
  • Internal Pipeline fabrications for Gas Power supplies for Shell Gas clients (Call out Contracts since 2022)
  • Revamping and Upgrade of LPG Tankfarm and modifications of Process piping systems For SC Johnson (2022 to 2023)
  • Process Production piping fabrication for Network E & P
  • Design, fabrication and installation of Gas Scrubber system with flow meter for Network E & P (2021)
  • Fabrication Of Mudmats For Subsea Manifolds for First E & P (2020)
  • Assembly, Mechanical Completion and Precommisioning Of Two Calm Buoys And PLEM From Orwell Solutions UK for Lekki Free trade zone jetty (2020)
  • Gas Pipeline and Process Studies and Engineering Design and Fabrication of 6” Natural Gas Pipelines and Process piping for Generators, Boilers and Furnace for Nestle Nigeria Plc (2019 to 2020)
  • Pipeline Detailed Engineering Design And Hydraulic Calculation for Bablink resources (2019)
  • Layout Design, Procurement, Fabrication And Installation Of Gas And Processing Facility Tanks And Piping System For Gas To A Storage Of 180 Metric Tonnes And Flammable Liquid For SC Johnson (2017 to 2019)